{"id":4195,"date":"2023-03-08T09:45:52","date_gmt":"2023-03-08T13:45:52","guid":{"rendered":"https:\/\/www.naturalinfrastructurenb.ca\/?p=4195"},"modified":"2023-03-08T09:45:52","modified_gmt":"2023-03-08T13:45:52","slug":"rapport-analyse-des-risques-derosion-et-dinondation-cotieres-sur-les-infrastructures-de-pokesudie","status":"publish","type":"post","link":"https:\/\/staging.naturalinfrastructurenb.ca\/fr\/nouvelles\/rapport-analyse-des-risques-derosion-et-dinondation-cotieres-sur-les-infrastructures-de-pokesudie\/","title":{"rendered":"Rapport: Analyse des risques d\u2019\u00e9rosion et  d\u2019inondation c\u00f4ti\u00e8res sur les  infrastructures de Pokesudie"},"content":{"rendered":"<p>&#8220;<a href=\"https:\/\/adaptationpa.ca\/fr\/secteur-caraquet\/pokesudie\">Adaptation Pokesudie<\/a><\/p>\n<p><span class=\"sous-titre\">Sc\u00e9narios et risques (\u00c9tape pr\u00e9paratoire)<br \/>\n<\/span><\/p>\n<p>Travail technique et scientifique effectu\u00e9 en 2022<\/p>\n<p><strong>Partenaires\u00a0:\u00a0<\/strong>Commission de services r\u00e9gionaux P\u00e9ninsule acadienne, Gestion Inuk Simard Inc., 2PIX Geomatics Inc.<\/p>\n<p><strong>R\u00e9sultats\u00a0:<\/strong><\/p>\n<ul>\n<li data-mce-word-list=\"1\">Mod\u00e8le num\u00e9rique de terrain de haute pr\u00e9cision bas\u00e9 sur des donn\u00e9es LiDAR<\/li>\n<li data-mce-word-list=\"1\">Projections de la hausse du niveau marin et des niveaux des mar\u00e9es de temp\u00eate<\/li>\n<li data-mce-word-list=\"1\">Projections de recul et d\u2019avanc\u00e9 du trait de c\u00f4te<\/li>\n<li data-mce-word-list=\"1\">Base de donn\u00e9es des infrastructures \u00e0 risque selon divers sc\u00e9narios d\u2019inondation et de recul du trait de c\u00f4te&#8221;<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>&#8220;Adaptation Pokesudie Sc\u00e9narios et risques (\u00c9tape pr\u00e9paratoire) Travail technique et scientifique effectu\u00e9 en 2022 Partenaires\u00a0:\u00a0Commission de services r\u00e9gionaux P\u00e9ninsule acadienne, Gestion Inuk Simard Inc., 2PIX Geomatics Inc. R\u00e9sultats\u00a0: Mod\u00e8le num\u00e9rique de terrain de haute pr\u00e9cision bas\u00e9 sur des donn\u00e9es LiDAR Projections de la hausse du niveau marin et des niveaux des mar\u00e9es de temp\u00eate Projections [&hellip;]<\/p>\n","protected":false},"author":1033,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[145],"tags":[],"class_list":["post-4195","post","type-post","status-publish","format-standard","hentry","category-nouvelles"],"_links":{"self":[{"href":"https:\/\/staging.naturalinfrastructurenb.ca\/fr\/wp-json\/wp\/v2\/posts\/4195","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging.naturalinfrastructurenb.ca\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/staging.naturalinfrastructurenb.ca\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/staging.naturalinfrastructurenb.ca\/fr\/wp-json\/wp\/v2\/users\/1033"}],"replies":[{"embeddable":true,"href":"https:\/\/staging.naturalinfrastructurenb.ca\/fr\/wp-json\/wp\/v2\/comments?post=4195"}],"version-history":[{"count":0,"href":"https:\/\/staging.naturalinfrastructurenb.ca\/fr\/wp-json\/wp\/v2\/posts\/4195\/revisions"}],"wp:attachment":[{"href":"https:\/\/staging.naturalinfrastructurenb.ca\/fr\/wp-json\/wp\/v2\/media?parent=4195"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/staging.naturalinfrastructurenb.ca\/fr\/wp-json\/wp\/v2\/categories?post=4195"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/staging.naturalinfrastructurenb.ca\/fr\/wp-json\/wp\/v2\/tags?post=4195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}